Services · Utility Coordination

We handle the utility — the hardest part of any charging project.

Power availability makes or breaks a fast-charging site. As a recognized installer working directly with DTE Energy and Consumers Energy, we manage the entire utility process on your behalf, start to finish.

What we manage

Everything between your site and the grid.

Load & capacity studies

We determine how much power your site can draw today and what it takes to support fast charging.

Service upgrades

When the existing service isn't enough, we scope and coordinate the upgrade — transformers, panels, and metering.

Interconnection applications

We prepare and submit the interconnection paperwork and manage it through approval.

Make-ready programs

We enroll your project in DTE and Consumers Energy make-ready programs that offset infrastructure cost.

Metering & rate setup

We coordinate metering and the appropriate rate structure for EV charging loads.

Timeline management

Utility work drives the schedule — we track and push every milestone so the project keeps moving.

The utility path

A clear route to power.

1

Assess available capacity

We review your existing service and the utility's capacity in the area to confirm what the site can support.

2

Design the service

We engineer the electrical service the project needs and identify any upgrades required.

3

Submit interconnection

We file the interconnection application and manage the back-and-forth with the utility through approval.

4

Enroll make-ready funding

Where available, we enroll the project in utility make-ready programs to reduce infrastructure cost.

5

Energize

We coordinate final metering, inspection, and energization so the site can go live on schedule.

Wondering if your site has the power for fast charging?

That's exactly what we find out first. Start with a free site assessment.